Phosphorus removal efficiency of Yaonigou constructed wetland on Fuxian lakeshore

CHEN Yuangao1,2, WU Xianhua3, LI Wenchao2, KONG Zhiming 1   

  1. 1. State Key Laboratory of Pollution Control and Resource Reuse, Environmental School of Nanjing University, Nanjing 210093, China;
    2. Nanjing Institute of Geography and Limnology, Chinese Academy of Sciences, Nanjing 210008, China;
    3. Yuxi Normal College, Yuxi 653100, China
  • Received:2004-06-17 Revised:2004-09-10 Online:2005-10-15 Published:2005-10-15

Abstract: To mitigate and control the eutrophication of the waters in Fuxian Lake bay,1 hm2 Yaonigou constructed wetland was built on the north Fuxian lakeshore,and the P removal of the wastewater from Yaonigou River was investigated by the techniques of precipitation pond,oxidation pond,and subsurface-and surface flow constructed wetland.The results demonstrated that this constructed wetland had a very strong capacity (7.8%~81.1%) of total phosphorus (TP) removal.The average removal rate of TP was 54.9%,and the TP retention in the constructed wetland was 265mg·m-2·d-1,of which,plant assimilation was 26.1mg·m-2·d-1,about 10% of the total.The TP removal was mainly through adsorption and sedimentation,but the seasonal growth dynamics of main plant Oenanthe javanica could have a definite effect on the efficiency of TP removal.During the examination,the TP retention capacity was in order of subsurface flow constructed wetland>oxidation pond>precipitation pond>surface flow constructed wetland.

Key words: Fuxian Lake, Constructed wetland, Phosphorous removal efficiency