WU Zhenbin, CHENG Shuiping, HE Feng, FU Guiping, JIN Jianming, CHEN Huirong . Design and purification performance of vertical flow constructed wetland[J]. Chinese Journal of Applied Ecology, 2002, (6): 715-718.
[1] Brix H.1994.Use of constructed wetlands in water pollution control: Historical development,present status,and future perspectives.Water Sci Tech,30(8): 209~223 [2] Cheng S-P(成水平),Xia Y-C(夏宜王争).1998.Studies on the artificial wetland with cattale and rush Ⅲ.Purification mechanism.J Lake Sci,10(2):66~71(in Chinese) [3] Chinese EPA (国家环境保护局).1989.Methods of Water and Wastewater Determination.3rd edit. Beijing:China Environmental Science Press.(in Chinese) [4] Cooper PF and Green B.1995.Reed bed treatment systems for sewage treatment in the united kingdom -The first 10 years' experience.Water Sci Tech,32(3):317~327 [5] Fetter CWJr,Slooy WE,Spangler FL.1976.Potential replacement of septic tank drain fields by artificial marsh wastewater treatment systems.Ground Water,14(6):396~401 [6] Hartog CD,Kevt J,Sukopp H.1989.Reed.A common species in decline.Aquatic Bot,35:1~4